Infrastructure Planning Chicago

Structured Technologies Group Past Projects

Wheels Inc Data Center

Project Details: Infrastructure Build-Out for the new Wheels Inc World Headquarters Data Center. This highly successful project operates as smooth as it looks. Structured Technologies carefully planned a Copper and Fiber Optic infrastructure and support systems that will serve Wheels Inc well into the future. This project presented many challenges but none more challenging than the tight time table and care for the critical nature of a network that serves the World Leader in Fleet Management Services.


Joliet Township Central & West High School

Project Details: Installation of over 40 IDF Cabinet Locations & Associated Cabling consisting of over 1500 data locations. Over 1200 man-hours were utilized on this particularly challenging project considering the building age and construction.

Contact: Karen Harkin / Technology Director (815) 727-6740


International Profit Associates / International Business Associates

Project Details: Installation of over 700 CAT6 Locations to support a new call center application. This very successful project was installed in tandem with existing infrastructure to allow for 0 downtime. Project included a complete MDF & IDF Build-Outs and utilized over 900 man-hours.

Contact: Jeff Gabor, Chief Operating Officer 847-808-5590


Harvard CUSD # 50 / Integrated
District Wide School Intercom

Project Details: Design and Installation of a District Wide School Intercom & Emergency Notification System. Structured Technologies Group Designed and Installed a District Wide integrated School Intercom & Emergency notification system utilizing the Valcom Class Connection. The District now enjoys class room level talk-back paging and district wide paging from any authorized telephone in the district.


Harvard CUSD #50 District Wide Access Control and IP CCTV System

Project Details: Design and Installation of a District Wide integrated Access Control and IP Surveillance System. Structured Technologies Group designed and installed a District Wide integrated Access Control, IP Surveillance & Door Communications System allowing centralized administration and control. Continental Access Panels and AXIS IP Cameras were chosen for this project for the enhanced features and integration options that they provide.

Contact: Lisa Tody 815-943-4200


East Bank Club / Voice & Data Infrastructure

Project Details: Design and Installation of a new Voice, Data and Fiber Optic infrastructure for the largest privately owned fitness center in the U.S. Structured Technologies Group designed and installed a flexible infrastructure in this 500,000 sqft facility in Downtown Chicago. The project consisted of a renovation of the existing data center, the installation of 5 new IDF locations, the installation of a complete copper and fiber optic backbone and re-cabling of over 700 user locations.

Contact: Dale McCarrel CFO 312-527-5800


The Vetro

Structured Technologies Group Designed and Installed a complete Access Control, Building Surveillance System and Building entry system in this New 31 Story High Rise Condominium in Downtown Chicago.


Hydac International

Structured Technologies Group Designed and Installed the technology infrastructure for Hydac's new Chicago area Headquarters. Included was a new network room, user infrastructure and connection of existing location with an underground fiber optic link.


Crest Hill Police Department & Public Offices

Structured Technologies Group Designed and Installed new CAT6 and Fiber Optic Infrastructure in preparation for new IP voice technologies.


Village of Carol Stream

Installation of underground fiber optic link from Village Offices to New Police Department.


City of West Chicago

Multiple Voice & Data Infrastructure Projects


Ambrosi

Design and Installation of Integrated Access Control and CCTV system in New Downtown Chicago Headquarters. This complex installation included 25+ doors of access control and cameras integrated with an enterprise solution providing flexible monitoring and control.


School District 93

Installation of Wireless Infrastructure for 9 Schools.


Harvard School District UPS Replacement

Structured Technologies Group Installed a New 30kVA UPS system in the District's Data Center replacing multiple smaller units. This successful project provided a greater level of systems and critical services protection and advanced levels of notification.

Industry Affiliations

View Structured Technologies Group's industry affiliations.

Industry Affiliations

Get a Quote

Get a quote on your project today. Fill out our quick and easy online form or call us at 630-293-9840.

Request a Consultation

Latest News

9/24/2009 North Aurora Police Department

8/23/2009 Structured Technologies Group has become a certified partner and solutions partner of Milestone Video management systems.

+ More News

Education InfrastructureHealthcare InfrastructureCorporate Infrastructure
  • Fiber Optic Infrastructure
  • Wireless Infrastructure
  • Distributed Antenna Systems
  • School Intercoms
  • Access Control Systems
  • CCTV Systems
  • Commercial Sound & Paging Systems
  • Industrial Sound & Paging Systems
  • Audio Visual & Boardroom Systems
  • Environmental Media
  • Program Distribution Systems
  • Telephone Systems
  • Voice Mail Systems
  • Auditorium/Gym Sound Systems
  • Nurse Call Systems
  • Design & Consulting Services
  • Health Care & Data Center Specialist
  • Project Management
  • Digital Signage
  • Refrigerator/Temperature Monitoring